OKK Koksovny a.s., Koksovna Svoboda (Coking Plant)

Year of implementation: 2012

Financial volume: EUR 400 thousand

PURPOSE

The existing coke dust is transported by railcars prepared at the fine screening plant. These are moved along the tracks to the sorting hopper building and unloaded there using conveyor belts. The technical solution of the implementation envisages the replacement of the new trouser clamps and conveyor belts that will connect the individual screening stations of the fine screening plant.

BASIC PARAMETERS

  • Coke dust quantity 100 thousand t/year
  • Storage capacity 90 t
  • Wagon loading 270 t/day
  • Conveyed material - coke dust

SCOPE OF SUPPLY

  • Preparation of relevant documentation (Study, Construction Execution Documentation (DPS), DD, VD, AS BUILT)
  • Partial deliveries of the Work parts
  • Supply of technology for screening stations, conveyor belts, hoppers, hopper leads, pant hoppers, caps and supply of steel structures
  • Installation, engineering and commissioning
  • Manufacture of technology components and steel structures