Ostravská těžební, a.s.

Year of implementation: 2016 – 2017

Financial volume: EUR 9,260 thousand; RPS: EUR 576 thousand

PURPOSE

The subject of the implementation was the construction of a complete technological line for the processing of tailings deposited at the Heřmanice tailings dump. The aim of the project was to obtain aggregate for construction purposes, tailings for reclamation and washed coal for energy purposes.

BASIC PARAMETERS

  • Transport capacity of the line 250 - 350 t/h
  • Conveyed material - thermal coal, tailings, aggregates

SCOPE OF SUPPLY

  • Preparation of relevant documentation (Study, Building Permit documentation (DSP), Construction Execution Documentation (DPS), DD, VD, AS BUILT)
  • Partial deliveries of the Work parts
  • Delivery of belt conveyor technology, magnetic separation, heavy liquor and classification cyclones, demagnetizing coils, tipping and overfill clamps, capping, operating hoppers/bins, supply of steel structures
  • Installation, engineering and commissioning
  • Manufacture of technology components and steel structures