TŘINECKÉ ŽELEZÁRNY a.s

Year of implementation: 2014 – 2015

Financial volume: EUR 9,250 thousand; RPS: EUR 346 thousand

PURPOSE

The subject of implementation in the RPS part of the Work was the reconstruction of the existing transport from the wagon tipper, new belt transport on the stacker itself, reinforcement of the existing steel structure of the conveyor belt bridge in the length of 500 m. The gantry stacker is used to place the material into the outdoor stockpile. During the placement process, the material is technologically homogenised so that it is spread in thin layers over the landfill area and the scooping machine removes the material from the landfill using a basket chain over the entire pile height.

BASIC PARAMETERS

  • The line transport capacity is 1,500 t/h
  • Conveyed material - agglomerate

SCOPE OF SUPPLY

  • Preparation of the relevant documentation ((Construction Execution Documentation (DPS), DD, VD, AS BUILT)
  • Partial deliveries of the Work parts
  • Supply of conveyor belt technology, hopper and overfill clamps, steel structures
  • Installation, engineering and commissioning
  • Manufacture of technology components and steel structures