Yunus Emre Adularya

Year of implementation: 2017

Financial volume: EUR 38 thousand

PURPOSE

The scope of the contract was to carry out a feasibility study to assess the existing condition and also to propose measures to commission the plant, ensuring its operation not only in terms of operational reliability but also in terms of safe operation.

BASIC PARAMETERS

  • Mining performance
  • Line conveying capacity 450 t/h
  • Conveyed material - lignite

SCOPE OF SUPPLY

  • Preparation of relevant documentation (feasibility study)
  • Assessment of the work in the sections raw coal stockpile, fuel storage, fuel treatment complex, coal feeding and fuel preparation, transport and treatment of fuel from field D