Outlet of screw feeders | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Outlet of screw feeders

Year: 2009
Customer: REMOV EK, s r.o., Most
Final user: Dalkia Česká Republika, a.s., Division Krnov

Location:                          Krnov

Purpose:

Thesubject of the action: "Modification of a furnace bin of the K5 boiler - the 2ndstage - Outlet of screw feeders" was a change of the current system of removingof material from the sections Nr.1 - 3 of the furnace bin of the K5 boiler, bymeans of which independent material transport to the K5 boiler wassimultaneously provided. The realization was performed on the basis of the currentbad condition of the supply line with the help of drag-line conveyors whichwere faulty due to their multiyear operation resulting in the necessary outagesand downtimes of the K5 boiler.

  •         dismantling of end chutes of the sections Nr. 1, 2 and 3 of the furnace bin of the K5 boiler
  •         installation of new chutes
  •         installation of screw conveyors D = Ø200, Ø280 mm, L = 5,000 ÷ 6,000 mm

 

 

BasicTechnical Specifications

  •         transport volume                                                         0.8 - 8.5 tons per hour
  •         transported material                                                    HHP (rough dross), ČHP, extracted meal       
  •         grain size                                                                     0 ¸ 50 mm
  •         number of installed conveyors                          3 pieces
  •         operational type                                                          yearlong
  •         number of operational days per year                            340

 

Subjectof the Job:

  •         documentation for building construction
  •         production documentation
  •         documentation of the actual building construction
  •         engineering 

 

>> all references



Další jazyky: /