K5 boiler fuel bin modification
Year: 2008
Customer: REMOV EK, s r.o., Most
Final user: Dalkia Česká Republika, a.s., Division Krnov
Location: Krnov
Purpose,Main Parameters:
The subject of the action"Modification of the K5 Boiler Furnace Bin" was the replacement of the fourthand fifth sections of the current bin, subsequent installation of a new screwconveyor for transportation of biomass to the boiler K5. Production andinstallation of the bin was performed on the basis of the increasing portion ofbiomass utilization as an alternative fuel for burning in the K5 boiler and itsolves the operational storage of fuels with a bulk density (mainly woodchips)lower than one of the fossil fuels.
- dismantling of the sections Nr. 4 and 5 of the K5 boiler furnace bin
- installation of a new section Nr. 4 of the furnace bin, the volume of 118 m3
- installation of a coal feed device including of a hydraulic aggregate
- installation of a screw conveyor D = Ø500 mm, L = 6.000 mm
- modification of walking platforms
BasicTechnical Specifications:
- transport volume 0.9 ÷ 14.5 tons per hour
- transported material woodchips, sawdust, pellets
- grain size 0 ¸ 50 mm
- number of installed conveyors 1 piece
- operational type yearlong
- operational days per year 340
Subjectof the Job:
- documentation for building construction
- production documentation
- documentation of the actual building construction
- engineering
![]() |
![]() |
![]() |
![]() |