Year: 2003
Customer: OKD Doprava, a.s. Ostrava
Final user: OKD a.s. Důl ČSA Karviná coal mine
Location: Karviná - Doly
Purpose:
Withinthe scope of the construction, the need for the loading of gangue from thewashing plant directly into railway wagons was dealt with. In relation to therequired change of technology, construction work of the current objects wascarried out. Further, needed modifications to the trackage were performed and anew dispatching hopper of gangue was built.
Ganguewith the grain size of 0 ÷ 500 mm is transported from the current process ofcoal preparation directly to the railway wagons today.
Basic technical parameters:
- conveyor line output 300 tons per hour
- transported material gangue
- grain size 0 ¸ 500 mm
- bulk density 1 400 ¸ 1 600 kg/m3
- output material humidity 5 ¸ 15 %
Subjectof the Job:
- documentation for building permission proceedings
- Documentation for building construction
- Production documentation
- engineering
![]() |
![]() |