Removal of flotation concentrate to the dumping place

Year: 2004
Customer: OKD a.s. Ostrava
Final user: OKD a.s. Důl ČSA Karviná coal mine

Location:                          KarvináDoly

Purpose:

The construction was brought on bythe need for the independent removal route of flotation concentrate from thewashing plant to the current washed coal dumping place. In relation to therequired change of technology, construction work on the current building in therange necessary for implementation and operating of the technologicalfacilities were carried out. The construction was performed in the closed areaof the Československá Armáda coal mine.

 

Basic technical parameters::

  •         conveyor line output                                        240 tons per hour
  •         transported material                                         dewatered flotation concentrate
  •         grain size                                                         0 ¸ 0.75 mm
  •         bulk density                                                     600 ¸ 800 kg/m3
  •         humidity                                                          15 ¸ 18 %

 

Subjectof the Job:

  •         documentation for building construction
  •         production documentation
  •         engineering and building management

 