Reconstruction of coal handling routes of the K3 boiler

Year: 2004
Customer: ATEL Energetika Kladno, s.r.o.
Final user: ATEL Energetika Kladno, s.r.o.

Location:                          Kladno

Purpose,Main Parameters:

The subject of the construction wasreconstruction of coal handling routes to the K3 boiler and provision of thecontinuous flow of fuel from the transfer place and reaching of the maximaloperating reliability of the technological unit during transition to a new fuelbasement. Within the scope of the action, reconstruction of a track hopper"SEVER" was carried out. Oblique walls were lined by the plastic material"Dialen Lining" (UHMW-PE) and the hopper was equipped with jets with pulseblow-off by pressurized air.

 

Subject of the Job:

  •         Documentation for building construction
  •         Production documentation
  •         "plug-and-go" construction supply

 