Processing of raw coal sludge | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Processing of raw coal sludge

Year: 2006
Customer: VÍTKOVICE-HEAVY MACHINARY,a.s., Ostrava
Final user: Severstal Cherepovets, Russia

Location: Cherepovets, Russia  

Purpose:

The purpose of the construction isproduction of power and coking coal from bituminous coal sludge dumped inoutside sedimentation tanks. The whole construction was divided into thefollowing operational units:

  • Hydraulic extraction and primary sorting
  • Enriching and mechanical dewatering of the product
  • Heat drying
  • Storing of the final product
  • Concentration and dewatering of waste
  • Storing of the waste

 

Basic technical parameters:

Bituminous coalsludge extraction:

  •         extraction method                                            hydraulic method - floating dredger
  •         surface of the extracted tank                            1,000 x 600 m
  •         extracting depth                                               max. 12 m
  •         required output                                    120 tons per hour

 

Treatment ofbituminous coal sludge:

  •         processing method                                          fraction 0 ÷ 0,25 mm   flotation

fraction0.25 ÷ 2 mm   separation spirals

 

Storing of products:

  •         storing capacity                                               ca 10 000 tons
  •         output of transport to storing place                   100 tons per hour
  •         output of expedite transport                             200 tons per hour

 

 

Subject of the Job:

  •         documentation for a tendering procedure

 

>> all references



Další jazyky: /