Lead-out line of aluminium sections
Year: 2005
Customer: Ferram a.s. Opava
Final user: Hydro, Norway
Location: Raufoss, Norway
Purpose,Main Parameters:
The subject of the job was toprocess drawing documentation for the technological facilities of the lead-outand packing lines for production of moulded aluminum sections.
The subject of the job was the productiondocumentation of the following machines:
- Belt conveyors 1-3
- Spacer magazine
- Spacer belt
- Stacker
- Destacker
- Skip transport 1, 2, 3
- Lifting equipment
Subjectof the Job:
- production documentation
- author's supervision


