Jemnice Composting Plant | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Jemnice Composting Plant

Year: 2009
Customer: Town hall in Jemnice
Final user: Town hall in Jemnice

Location: Jemnice

 

Purpose:

Thestrategic goal of the project, Jemnice Compost Plant, is the installation offacilities for processing biodegradable wastes (BDG). Construction of thecompost plant will provide an increase in the material utilization of municipalwaste (MW) simultaneously with a decrease in the volume of dump waste.

 

BasicTechnical Specifications:

  •         maximal BDG processing capacity                               max. 4 thousand tons per year
  •         expected processing volume of BDG               2-3 thousand tons per year     
  •         number of installed fermenter units                               2 pieces
  •         operational type                                                          yearlong
  •         number of operational days per year                            340
  •         number of fermentation cycles (96 hrs)             85
  •         processing cycle time                                                  48 - 96 hrs

 

Subjectof the Job:

  •         zoning process documentation
  •         documentation for building permission proceedings

 

>> all references



Další jazyky: /