Installation of the EBW sludge centrifuge in the preparation plant | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Installation of the EBW sludge centrifuge in the preparation plant

Year: 2003
Customer: OKD, a.s., Ostrava
Final user: OKD, a.s., Důl ČSA Karviná coal mine

Location : Karviná - Doly

 

Purpose:

Withinthe scope of modernization of the preparation plant of Jan-Karel, a new networkscrew centrifuge of the EBW 42 type was installed for dewatering of coarsesludge from the tops. The new centrifuge was installed in the room of thecurrent preparation plant.

Theaction included new transport routes for transportation of dewatered coal,steel bins and a system for discharging from the bins.

 

Basic technical parameters:

  •         centrifuge output                                                         40 tons per hour
  •         conveyor line output                                                     60 tons per hour
  •         transported material                                                     washed coal
  •         grain size                                                                     0 ¸ 3 mm
  •         concentration of the suspension supplied for dewatering           400 g/l
  •         bulk density of dewatered coal                         800 ¸ 900 kg/m3
  •         output humidity                                                12 ¸ 18 %
  •         storing capacity of bins                                    2 x 33 t
  •         discharging output from the bins                                   120 tons per hour

 

Subjectof the Job:

  •         Documentation for building construction
  •         Production documentation
  •         engineering 

 