Increasing in capacity of mucking routes – the Lazy preparation plant | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Increasing in capacity of mucking routes – the Lazy preparation plant

Year: 2006
Customer: OKD, BASTRO a.s. Ostrava
Final user: OKD a.s. Důl Lazy Coal Mine

Location:                     Orlová

Purpose:

Theneed for construction was brought about by the necessity of increasing intransport routes for the production of raw dust in the preparation plant Lazy.In relation to changes and completing of the technology, construction work ofthe current objects in the range necessary for implementation and operation ofthe technological facilities were carried out.

Constructionwas carried out in the closed area of the Lazy Coal Mine. The external groundlimits and height arrangement of the main objects was not changed by theconstruction. A new transport bridge between the transfer point "J" and thebuilding of raw coal hoppers was built, outside the area of the currentbuildings.

 

Basictechnical parameters:

  •         conveyor line output                                        700 tons per hour
  •         transported material                                         raw coal
  •         grain size                                                         0 ¸ 20 mm
  •         bulk density                                                     1,250¸1,500 kg/m3
  •         humidity                                                          12 ¸ 15 %

 

Subjectof the Job:

  •         documentation for building permission proceedings
  •         documentation for building construction
  •         production documentation
  •         engineering 

 