Douglas washing Plant | RPS - realizace průmyslových staveb


Realizace průmyslových staveb


Douglas washing Plant

Year: 2007
Customer: DRA Mineral Projects, South Africa
Final user: BHP Billiton, South Africa

Location:                     Douglas, South Africa 

Purpose,Main Parameters:

The subject of the action was theco-operation of the engineering solution and processing of the productiondocumentation for the technological facilities of the preparation plant forcoal production. It was a complex solution of nodes in a "crusher building",where all transfer points from belt conveyors to individual technologicalfacilities were dealt with. Further, all transfer points (platework),discharging hoppers, boxes and tanks in the main plant. Our employees furthertook part in the preparation of production and author's supervision of plantbuilding.

 

Technological parameters:

Equipment for the production of:          coal

Location:                                             Middelburg(South Africa)

Plant Capacity:                        1 million tons per year

 

Subjectof the Job:

  •         Documentation for building construction
  •         Production documentation

 

>> all references



Další jazyky: /