Muck destoning in the Dukla plant
Year: 2005
Customer: OKD a.s. Ostrava
Final user: OKD a.s. Důl Lazy –Dukla plant
Location: Havířov
Purpose:
Theconstruction was realized with respect to the necessity to sort outcoarse-grained gangue out of extracted coal, loading of gangue from the sortingplant directly to railway carriages and the provision of loading of raw coalinto railway carriages on the tracks nr. 5 and nr. 7. Charging stations werebuilt in the trackage and wagon scales were also placed there.
Inrelation to the required change of technology, construction work of the currentbuilding will be carried out in the range necessary for implementation andoperating of the technological facilities. The construction was realized in theclosed area of the coal mine Důl Lazy - Dukla plant.
Basic technical parameters:
Transportation ofextracted coal:
- conveyor line output 800 tons per hour
- transported material raw coal
- grain size 0 ¸ 20 mm
- bulk density 1,250 ¸1,500 kg/m3
- humidity 12 ¸ 15 %
Raw coal transportation:
- conveyor line output 800 tons per hour
- transported material raw coal
- grain size 0 ¸ 500 mm
- bulk density 1,250 ¸1,500 kg/m3
Transportation ofgangue:
- conveyor line output 50 tons per hour
- transported material gangue
- grain size 150 ¸ 500 mm
- bulk density 1,500 ¸1,800 kg/m3
Subjectof the Job:
- documentation for building permission proceedings
- documentation for building construction
- production documentation
- engineering
![]() |
![]() |
![]() |
![]() |