Building conversion for biomass burning in FK 2
Year: 2008
Customer: REMOV EK, s r.o., Most
Final user: ČEZ, a.s., Hodonín Power Plant
Location: Hodonín
Purpose,Main Parameters:
The subject of the action "ConstructionWork for Biomass Burning in FK2" was a complex modernization of the transportof biomass from the outside place of fuel charging through material storing inthe boiler room up to the transport of biomass to the FK2 boiler. The complexrealization was carried out on the basis of the increasing portion of biomassutilization as an alternative fuel for burning in the FK2 boiler and it also solvesthe operational storing of fuels with a bulk density lower than one of the fossilfuels.
- PS01 Biomass outside storage area
- construction of a roofed outside storage area
- installation of conveyor double-screws Ø500 mm
- installation of commercial scales onto the currentconveyor
- PS02 Storing of biomass in the boiler room
- dismantling of 2 pieces of the current hoppers forfossil fuels
- installation of 2 pieces of new hoppers for biomass,volume 200 m3
- installation of a coal feed device, including ofhydraulic aggregates
- installation of discharging screw conveyors D = Ø630 mm, L = 6.000 mm
- PS03 Transportation of material to FK2
- installation of transport screw conveyors D = Ø630mm, L = 6.000 mm
- installation of a divided chute with a manual controlledgate
- installation of an emergency material chute
BasicTechnical Specifications
- transport volume 20 ÷ 100 tons per hour
- transported material woodchips, sawdust, pellets
- grain size 0 ¸ 70 mm
- number of installed conveyors 8 pieces
- operational type yearlong
- number of operational days per year 340
Subjectof the Job:
- documentation for building construction
- production documentation
- documentation of the actual building construction
- engineering
![]() |
![]() |
![]() |
![]() |






